Scope: Fully managed installation of 4G Wi-Fi and On-Board system, Fully Managed Webasto Heater replacement
Customer: Northern Rail
Work scope summary – WiFi:
Yellow Rail delivered two multi-fleet / multi-depot modifications for Northern Rail:
16 x Class 333 Units, 5 x Class 321 Units, 3 x Class 322 Units
- Supplier Selection / Management and Audit
- Full logistic package from fabrication to kitting and assembly & test
- Project Management from Swedish Client HQ to UK Train Operator
- Delivery interface with Train Owner Angel / Maintainer Siemens and Operator Northern
- Multi fleet and multi-site installation
- Multi-site switch on commission with uploaded media content delivered for media launch
- Warranty support and spares management
- TOC Staff Training
Work scope summary – Webasto Heaters:
14 x Class 150 Units, 18 x Class 153 Units, 24 x Class 156 Units, 27 x Class 158 Units
- Engineering / installation interface support
- Safety Critical removal of existing Heaters from underside of train
- Safety Critical fitment of Webasto Thermo 300 Auxiliary Heaters
- Production and Site Management
- Procurement and Material supply/management
- Electrical and Heater disconnection
- Heater removal and fitment
- Heater junction box wiring
- Cab cupboard (A&B) wiring
- Testing and Commissioning and software configuration
- To be delivered at 4 sites simultaneously:
- Heaton / Newton Heath / Allerton / Neville Hill